Driveway damage is frustrating to look at and experience and often requires immediate attention. But property owners often wonder, how long will this take? The duration of time is dependent on various aspects, such as the extent of the damage, resources available, and weather conditions. By knowing in advance what to anticipate, you can schedule accordingly and get your driveway the attention it requires without unnecessary postponements.
Inspecting the Damage
The initial step in driveway repair is to check on the condition of the driveway’s surface. Shallow cracks and surface wear can be easily handled in a short time, sometimes just a few hours. But with major damage that deepens below the surface, repair will take longer. Experts will check the driveway to assess the extent of the problem and propose the most suitable method of fixing it.
Small Repairs and Patching of Surfaces
Minor surface damage does not necessitate a longer duration of repairs. Filling cracks or sealing pavement can be completed in a day, although the sealant needs time to harden. Patching small potholes or dents is also a quick process that typically requires a few hours, depending on the size or quantity of areas that need fixing. The repairs maintain the driveway’s lifespan and stop it from getting even more worn.
Resurfacing for Medium Damage
When damage is more widespread but not intense enough to require a total replacement, resurfacing is likely the ideal option. The procedure involves removing the upper driveway layer and replacing it with a new concrete or asphalt layer. Resurfacing is completed in one or two days, though more time is taken in curing to enable the reuse of the driveway. Weather is a determining factor in terms of when a new surface hardens, as high temperatures or rainfall can hinder it.
Full Replacement of a Driveway
Severely damaged driveways need a total replacement, which is inevitable in most instances. The procedure is more time-consuming as the old driveway needs to be removed completely before installing a new one. Excavation alone can take a day or more, depending on the driveway size and the material to be removed. After pouring or laying a new surface, it needs time to harden and set. Asphalt driveways take a minimum of 24 to 48 hours to use again after a new installation, while concrete driveways take even more time, sometimes a week.
Weather and Other Delayed Factors
Weather is one of the key factors that determine driveway repair timetables. Rain, high temperatures, and humidity determine the time to set or harden material. Professionals alter their working schedules depending on the weather to deliver the best results. Material availability and appointment time with experts can sometimes lead to small delays as driveway repair services may be in high demand seasonally.
How to Achieve a Smooth Process
While some delays cannot be avoided, homeowners can ensure a smooth driveway repair process by preparing in advance. Removing vehicles and debris from the driveway ensures smooth services. Planning around each other’s schedule and knowing the completion time also keeps everyone’s expectations in check.
Use a Proven Business to Get it Right.
Whether it is a small or large repair, professional help plays a massive role. At King’s Services, we understand homeowners naturally want quick service without sacrificing quality. That’s why we take time to review every job carefully, use quality material, and work hard to get repairs completed on schedule. If you need driveway repair, reach out to our experts to get it done quickly and perfectly!